The Chart:

Showing posts with label B-LJK. Show all posts
Showing posts with label B-LJK. Show all posts

Wednesday, December 18, 2013

First 747-8 PIP Delivery

Today, Cathay Pacific takes delivery of line 1483 (RC561) B-LJK, marking the first delivery of a 747-8 with PIP engines. According to Boeing's press release, activation of the other two major improvements, the flight computer upgrade (for all 747s models 400 and up) and tail tank enablement (for 747-8I only), will proceed later this month and early January (with Lufthansa) respectively. Here's to (1.8%) more efficiency! Pics to come.

And more details from Aviation Week (thanks for the heads up Mario), stating a total of 3.5% efficiency increase with the whole package (1.8% is from engine only):

The upgraded engine forms the core of a broader set of aerodynamic and structural improvements that have been introduced since the freighter and passenger versions of the aircraft first entered service in 2011 and 2012 respectively. “Together with the other improvements made since entry-into-service on the 747-8F at the end of 2011, the engine PIP bundles 1.8% with another 1.7% for a total of 3.5% (fuel burn),” says 747-8 chief project engineer Bruce Dickinson. In addition to drag reduction and improvements to the cruise efficiency of the wing, the empty weight of the 747-8 has been reduced by almost 8,000 lb, while payload-range capability has been boosted through a 12,000 lb. increase in maximum take-off weight. The GEnx-2B67 PIP incorporates an all-new low-pressure turbine, as well as compressor, combustor and turbine improvements derived from the second batch of upgrades (PIP II) devised for the GEnx-1B engine on the 787. GE provisionally expected a 1.6% fuel burn improvement but, based on positive test data, upped this to 1.8%. The package of upgrades was launched after pre-delivery flight tests revealed a fuel burn performance shortfall in excess of 2%.

Friday, December 6, 2013

Looking Like 23 Deliveries For 2013

Blogger.com is blocked from China, as is a bunch of other stuff. I found a way to keep the chart updated though.

So I missed all the excitement of all three new Cathay frames having B1s over 4 days (and it was almost three consecutive). That would be lines 1483 (RC561) B-LJK, 1484 (RC562) B-LJL, and 1486 (RC563) B-LJM.

It looks like between these three and lines 1479 (RC525) JA15KZ (for NCA) and 1483 (RC605) VQ-BRJ (for ABC), Boeing is really pushing to get them out before the end of the year, which would give us 23 deliveries for 2013.

I scored three 747-400 rides this trip, and it's good to see so much 747 activity at the big airports. It's not what it used to be but there are still a lot of them taxiing around. I flew on RP-C7472 (line 1012 for Philippines from LAX to MNL), B-HUF (line 993 for Cathay from HKG to TPE), and B-18207 (line 1176 for China Airlines from TPE to LAX), with a bonus short hop in an A340 from MNL to HKG on the outgoing, which happens to be my favorite Airbus. It was scheduled for an A330, which is the most boring airliner in existence to me, so the swap was a great surprise. A340-300 RP-C3438 was fresh over from Iberia to Philippines Airlines, still with the old Iberia livery minus branding.

Saw a lot of 747-8s on this trip too. Can't wait to fly in one. They really are the best looking version of the best looking airliner ever made. Here are some pics:

RP-C7472 - don't those engines just give you warm fuzzies?

Upper Deck!

RP-C3438 still wearing old clothes.

Hong Kong - How many 747-8s can you count?

D-ABYF at Hong Kong.

B-HUF ready for a short hop to Taiwan.

There isn't always time for a great pic, but gotta get the tail number. Funny thing was the cute flight attendant listed it off from memory before I took this shot to verify. I'm in love.
Need For (Ground) Speed Baby!!

Wednesday, September 25, 2013

New Engines Being Installed?

Judging from Matt Cawby's latest flight line shot, it looks like line 1483 (RC561) B-LJK for Cathay Pacific is at the fuel dock and possibly has engines. Or is that an optical illusion? Also, the unknown frame in stall 118 has two balance weights removed, which could mean she's getting engines too.